Published Sydney building estimates commonly suggest approximately eight to 10 months for a typical single-storey home and 10 to 14 months for a typical double-storey home. These estimates cover construction and exclude design, approvals and demolition.
Generally, yes. A single-storey home has a simpler structural system and does not require an upper floor, staircase or the same level of scaffolding.
Not usually. Plans, engineering, selections, approvals and other pre-construction requirements generally need to be completed before building work begins.
No. Demolition and site clearing occur before construction and should be allowed for separately. Masterton knockdown rebuild customers must arrange the demolition application and complete demolition before Masterton can commence construction. We recommend waiting until approval for the new home has been received before demolishing the existing property.
They can. Custom homes may involve additional design, engineering, specialised products and more complex construction work.
Yes. Prolonged rain, high winds or extreme temperatures may affect excavation, concrete work, roofing and external construction.
A builder can provide a more relevant estimate once the home design, site requirements, inclusions and approval pathway are understood. The program may be updated as construction progresses.
The complete timeframe includes design, site investigations, approvals, demolition and construction. Timing will vary according to the approval pathway, selected home, site conditions and construction program. Your builder can provide a more relevant estimate after reviewing your property and proposed home.
Not every property can be demolished or redeveloped without restrictions. Heritage controls, conservation areas, easements, significant vegetation, environmental conditions and local planning rules may affect what is permitted. Planning controls should be investigated before committing to a home design or demolition contract.